The Challenge – Morthland College

About the Project

The challenge was to build and install an elevator in the middle of an existing five-story building to increase accessibility for a college. It was also very important for the project to be completed quickly, in between semesters and at a reasonable cost.  Also as students would have full access to the elevator it had to be durable and able to take the rigors of a lot of use.

The Result

The solution was a Phoenix Modular Elevator with a single hydraulic jack. Once we received the approved specifications the elevator was built in our factory in less than eight weeks, then transported to the main building on campus and install in less than one week.  The design was durable and we were able to complete the project under budget.